Ref. HS-SYS-005 · Utility Glyph Set · v1.0.0 · LOCKED 2026-05-16
Utility Set — Twenty Glyphs
Scientific-plate register · accurate geometry · hatched form-shading · 5 rows × 4 · 96×96 · per glyph-spec.md v0.2 (derived)
Status — locked at v1.0.0 (2026-05-16). Iterate freely; save over this file. Once the set is final, lock it as v1.0.0 (snapshots 20 SVGs into system-glyphs/v1.0.0/ + manifest, writes a CHANGELOG lock entry). After that, skills reference the locked version. Working-draft history lives in system-glyphs-CHANGELOG.md next to this file.

A working set of twenty general-purpose glyphs, sequenced UT-01…UT-20, to replace emoji in the daily brief, job-pipeline report, and any other system output. Built to the same rules as the brain explorations (HS-SYS-003) so they sit consistently next to the locked set. Each glyph carries an active core (pulsing dot) where it makes semantic sense; ones that should feel static (a calendar date, a list item) stay still.
Row 1 — Affirmation & State · check · cross · warning · status pill
UT-01
Check
completed · UT-01
UT-02
Cross
rejected · UT-02
UT-03
Warning
caution / risk · UT-03
ACTIVE HOLD STOP IDLE UT-20
Status Pill
4 states · UT-20
Row 2 — Direction & Goal · target · trending · launch · star
UT-04
Target
goal / aim · UT-04
UT-06
Trending Up
growth · UT-06
UT-10
Launch
ship / go-live · UT-10
UT-16
Star
priority · UT-16
Row 3 — Data & Info · chart · search · list · note
UT-05
Chart
data / metrics · UT-05
UT-11
Search
investigate · UT-11
UT-09
List
agenda · UT-09
UT-08
Note
draft / memo · UT-08
Row 4 — Time & Urgency · calendar · clock · hourglass · fire
UT-12
Calendar
scheduled · UT-12
UT-13
Clock
time · UT-13
UT-14
Hourglass
in progress · UT-14
UT-15
Fire
urgent · UT-15
Row 5 — Communication & Outcome · speech · email · idea · trophy
UT-17
Speech
message · UT-17
UT-18
Email
inbox · UT-18
UT-07
Idea
insight · UT-07
UT-19
Trophy
win / offer · UT-19
In context — Daily Brief · glyphs at body-text scale, where they live
Submitted application to Self.inc — Senior PM, Growth UT-01
Closed loop — Notion role rejection received UT-02
Coda recruiter hasn't replied in 6 days UT-03
Goal this week — 4 new outbound conversations UT-04
Tomorrow — Self.inc interview prep block, 2pm UT-12
Hot — Coda final round Friday, prep needed UT-15
In context — Pipeline status · UT-20 inline, the high-leverage one
Self.inc · Senior PM, Growth — recruiter call scheduled active
Coda · PM II, Docs — final round Fri active
Linear · PM, Growth — awaiting recruiter response hold
Notion · PM, Platform — rejected 2026-05-13 stop
Figma · Group PM — never followed up idle
Twenty utility glyphs · UT-01…UT-20 · drop-in replacements for the most common emoji in system output.
Build: accurate geometry · fine confident linework · hatched form-shading · burgundy mono · per glyph-spec.md v0.2 (HS-SYS-003, real spec).
Archive Classification: Personal · HS-SYS-005 · Utility Glyph Set v1.0.0 · LOCKED · MMXXVI